Project Brief for the Proposed Construction of Hydrometric Stations at Ha Hlobola and Ha Setene in Zones 2 and 3 of the LLWDP II

Tsebiso – Sechaba Se Amehang
10/05/2021
LLWSSP Resettlement Policy Framework
11/11/2021

Project Brief for the Proposed Construction of Hydrometric Stations at Ha Hlobola and Ha Setene in Zones 2 and 3 of the LLWDP II

[featured_image]
  • Version
  • Download 652
  • File Size 3.10 MB
  • File Count 1
  • Create Date 21/09/2021
  • Last Updated 21/09/2021

Project Brief for the Proposed Construction of Hydrometric Stations at Ha Hlobola and Ha Setene in Zones 2 and 3 of the LLWDP II

Attached Files

File
Project Brief Hydrometric Stations .pdf

Comments are closed.